-- WP3 - Crutial - CRitical Utility InfrastructurAL resilience
   
 

WP3

Testbed development

The goal of WP3 is to design and implement two testbeds, integrating the electric power system and the information infrastructure. The detailed objectives are threefold:

  • elaboration of control scenarios in order to better identify them (related to WP1);
  • elaboration of architectural patterns (related to WP4);
  • elaboration of interdependencies, complementary to the modelling of WP3.

The testbeds are composed of two platforms: the first will be based on power electronic converters that are controlled from PCs that are interconnected over an open communication network (Herakles, at K.U.Leuven); whilst the latter will consist of power station controllers on a real-time control network, interconnected to corporate and control centre networks (at CESI).

 
 
 